Electronic control with microprocessor, the furnace manages 7 programmes with 4 phases per programme.
The following can be set for each phase: temperature, raising speed and holding time.
An ignition delay up to 100 hours can also be set.
The furnace ZEUS 2 comes with a monobloc ceramic muffle with an external wrapped around resistance.
This enables the temperature to be homogeneous in all its 4 sides: upper, lower and laterals.
The fumes follows a natural circulation and come out from a rear chimney.
To improve the exit of the fumes a chimney, which is supplied as an accessory, can be installed (SR731).
Such installation is extremely simple and can be done by the operator.
The oven features a safety micro-switch, which stops the resistance in case the chamber is opened.
The oven is airtight with environmental materials in compliance with the requirements.
Another useful accessory is the dewaxing plate which we also advise to buy, in fact it prevents the liquid wax from being absorbed by the muffle, keeping it free from abrasions and deteriorations which can damage it.